Project: Maintenance Community “Quatre Vents”, San Telmo

No Lawn Mowing ATM

July 13th, 2009 Posted in ATTN: Administration, ATTN: President, Attn: Administración, Attn: Presidente, Maintenance, Mantenimiento | No Comments »

As the community did not pay my last month´s invoice until today (and as we already are in the middle of the next, and as my reserves are used up now) I have currently no money nor means to buy the 20 ltrs gasoline we need for the lawnmower, the blower and the disk every month.

As I have no gasoline left I have no means to do the lawn mowing and am forced to suspend it until this situation changes.

All other works continue to proceed as usual at the moment.

Just FYI.

13.7.09 (0600-0930 = 3.5h)

July 13th, 2009 Posted in Daily Report, Informe diario, Maintenance, Mantenimiento | No Comments »

General and block 1 work:

- someone had used the two hoses in the garage and left them all crumpled up on their suspensions, had to straighten them out and put them up so they do not break

- cleaned, vaccumed, filled and adjusted the pool

- pressure cleaned the terrace partially, the seagulls had had a feast again

- Pruned the two Akaziae, the bushes and Lantanas in block 1

- watered the flower beds around block 1

Currently no ressources to mow lawns (see: http://mallorca-service.net/blogs_qv/?p=701)

12.7.09 –

July 12th, 2009 Posted in Uncategorized | No Comments »

weekend

11.7.09 (0715-1015 = 3)

July 12th, 2009 Posted in Daily Report, Informe diario, Maintenance, Mantenimiento | No Comments »

Community:

- pruned the two akaziae between block 3+4

- mowed community lawns

- cleaned all access paths in detail

10.7.09 (0630-1000 = 3.5h)

July 12th, 2009 Posted in Daily Report, Informe diario, Maintenance, Mantenimiento | No Comments »

Finished the cleaning of the Block 3 rear hedges

Community:

- started trimming the camilla, on the path sides

- cleaned the pool, trimmed the bushes in the rear community area

- cleaned the garage

9.7.09 (0645-1000 = 3.25)

July 12th, 2009 Posted in Daily Report, Informe diario, Maintenance, Mantenimiento | No Comments »

Block 3:

- mowed the lawns

- attached the hose holder to garden B (Bonet)

- trimmed and pruned the hedges in the rear

- cleaned out profoundley below the hedges there from both sides (did not manage to finish more than one half of garden A  in that time)

8.7.09 (0600-1100 = 5h)

July 12th, 2009 Posted in Daily Report, Informe diario, Maintenance, Mantenimiento | No Comments »

Block 4:

Garden A (Cole)

- deweeded and cleaned out the front part bordering the terrace

- pruned the small palm three there

- mowed the lawns

7.7.09 (0630-1030 = 4)

July 12th, 2009 Posted in Daily Report, Informe diario, Maintenance, Mantenimiento | No Comments »

Block 2:

- mowed the lawns

- deweeded and cleaned out the rear of garden b(GObetti) in detail.

- planted a few rosemaries and some Cactus there, als some Ivy to close the defect

- cleaned all acess path

- planted also some cactus in the community rear meadow to on the long run hide the fence.